5 Information about the development of the Alexandria tram

The Bankir website publishes in the following report the 5 most important information about the development of the Alexandria tram

• The development is undertaken by the Arab Contractors Alliance and Hassan Allam

• The development cost is 363 million euros

• Expectations to start work during the second half of 2025 for a period of two years

• Upgrading 24 stations, electrical and mechanical systems, signals, communications, central control, ticket gates and infrastructure

• The tram route is 13.2 km.



مصدر الخبر

Leave a Reply

Your email address will not be published. Required fields are marked *